Vinyl plank & laminate flooring installation in Ottawa.
Floors go in after the walls and ceilings are painted. GCO Contracting installs luxury vinyl plank and laminate over a flat, prepared subfloor, with clean transitions and new baseboards, in basements, kitchens and whole homes.

Why choose GCO Contracting.
- Subfloor checked and levelled first, so planks don’t flex or separate.
- Waterproof vinyl plank, including Life-Proof, for basements.
- Raised, insulated subfloors over basement concrete.
- Transitions, stair nosings and baseboards finished to match.
Luxury vinyl plank (LVP)
Waterproof, warm underfoot and tough, the go-to floor for Ottawa basements and busy kitchens.
- Basements over a raised, insulated subfloor
- Kitchens, mudrooms and laundry rooms
- Click-lock floating and glue-down installs
- Stairs with matching nosings
- Heated floor systems under vinyl where rated
Laminate flooring
A real wood look at a lower price for bedrooms and living areas.
- Bedrooms, living rooms and hallways
- Underlayment with a moisture barrier
- Old carpet and flooring removed and disposed of
- Doors trimmed to clear the new floor
- Baseboards and quarter round installed
Why vinyl plank is the go-to basement floor
Luxury vinyl plank is waterproof, warm underfoot and floats over a subfloor, so it suits Ottawa basements better than hardwood or laminate. We install GCO’s Life-Proof range: Golden Select, Versaclic and Kairos.
- Waterproof core that won’t swell if there is a leak
- Raised, insulated subfloor (such as DRICORE) under it in basements
- Quiet underlayment for upper floors and condos
- Plank widths of about 7″ in a range of oak looks
Vinyl plank vs laminate
Both look like wood. Vinyl plank handles water; laminate is usually cheaper and feels harder.
- Basements, kitchens, laundry and bathrooms: vinyl plank
- Bedrooms and living rooms on upper floors: either
- Pets and kids: vinyl plank for scratch and water resistance
Our seamless 4-step renovation process.
From the free in-home consultation to your 5-Year Master Care Warranty, you always know what happens next, and every project ends with a walkthrough and a completed punch list.
- 1
Consultation & quote
Free in-home assessment, detailed measurements, custom design consultation and a written estimate with timeline and budget breakdown.
- 2
Design & planning
3D renderings, material selections, engineering drawings, City of Ottawa permit applications and final construction drawings.
- 3
Build & project management
Demolition, framing, rough-ins, inspections, finishing, cabinetry, countertops, painting, flooring and final detailing.
- 4
Final walkthrough & warranty
Professional cleanup, quality inspection, owner walkthrough, punch-list completion and Master Care Warranty activation.
GCO Contracting, Ottawa’s general contractor for forever homes, kitchens and baths, specializes in refined, high-quality renovations with a strong emphasis on precision, cleanliness and overall client experience. We maintain a controlled, well-managed work environment with strict attention to dust containment, site cleanliness and efficient scheduling. Every phase is executed with intention, and every project is backed by our 5-Year Master Care Warranty.
Vinyl plank & laminate flooring installation across Ottawa
GCO Contracting works from our Nepean office at 38 Auriga Dr, Suite 200, Nepean, ON K2E 8A5 across the city, including:
Common questions.
Short, plain answers. Anything else, call and ask for Aurelio, the owner of GCO Contracting.
Vinyl plank. It’s waterproof, while most laminate has a wood-fibre core that swells if it gets wet. For Ottawa basements we recommend waterproof vinyl plank over a raised, insulated subfloor.
Yes, once the concrete is dry and flat. We check moisture, grind or level high and low spots, and add an underlayment or raised subfloor.
Most rooms take a day; a full basement or main floor about two to four days, plus time for any levelling.
Yes. We check the slab for moisture and flatness, level it where needed, and usually install a raised insulated subfloor first so the floor is warmer and drier.
An average room takes a day; a full basement two to four days, plus any levelling or subfloor work beforehand.
Let’s plan and design it together.
Book your free virtual or in-person design-build consultation. Complete our quick quote form and we’ll reply within 24 hours.