Concrete floor levelling in Ottawa.
Uneven floors crack tile and make vinyl planks separate. Before new flooring goes in, GCO Contracting grinds high spots, patches cracks and pours self-levelling compound so the floor is flat and ready.

Why choose GCO Contracting.
- Floors measured for flatness against the flooring maker’s requirements.
- Grinding, patching and self-levelling done in the right order.
- Moisture tested before flooring goes on concrete.
- One team for the levelling and the flooring on top.
Levelling & preparation
Each floor gets the fix it needs.
- Self-levelling compound over concrete and wood subfloors
- Grinding high spots and ridges
- Crack and hole patching
- Primer for proper bonding
- Moisture tests on basement slabs
Where it matters most
Some floors need it more than others.
- Basements before vinyl plank or tile
- Large-format tile in bathrooms and kitchens
- Old floors after demolition
- Heated floors embedded in levelling compound
- Additions joining an older floor
Our seamless 4-step renovation process.
100% guaranteed. From the free in-home consultation to your Master Care Warranty activation, you always know what happens next.
- 1
Consultation & quote
Free in-home assessment, detailed measurements, custom design consultation and a written estimate with timeline and budget breakdown.
- 2
Design & planning
3D renderings, material selections, engineering drawings, City of Ottawa permit applications and final construction drawings.
- 3
Build & project management
Demolition, framing, rough-ins, inspections, finishing, cabinetry, countertops, painting, flooring and final detailing.
- 4
Final walkthrough & warranty
Professional cleanup, quality inspection, owner walkthrough, punch-list completion and Master Care Warranty activation.
GCO Contracting in Forever Homes, Kitchens & Baths specializes in refined, high-quality renovations with a strong emphasis on precision, cleanliness and overall client experience. We maintain a controlled, well-managed work environment with strict attention to dust containment, site cleanliness and efficient scheduling. Every phase is executed with intention, and every project is backed by our 5-Year Master Care Warranty.
Most vinyl plank makers require a floor flat to within about 3/16 inch over 10 feet. Dips and humps beyond that make planks flex and separate, so we level them first.
Most products can be walked on within a few hours, and tile or vinyl can usually go down within one to two days depending on thickness.
Yes. We check for moisture and cracks, grind high spots and pour self-levelling compound, or build a raised, insulated subfloor where that suits the space better.
Let’s plan and design it together.
Book your free virtual or in-person design-build consultation. Complete our quick quote form and we’ll reply within 24 hours.