How long does a kitchen renovation take in Ottawa?
About 2 to 4 weeks for a refresh and 4 to 12 weeks for a full remodel. Where your kitchen lands depends on size, structural work, permits and how long cabinets and counters take to arrive.

By GCO Contracting Inc. ·
Kitchen timelines at a glance.
| Project | Typical size | Timeline |
|---|---|---|
| Kitchen refresh (counters, backsplash, fixtures, paint) | Small kitchen | 2–4 weeks |
| Standard kitchen remodel | Medium kitchen | 4–6 weeks |
| Large or mid-to-high-end remodel | Medium to large | 6–8 weeks |
| Luxury custom or open-concept kitchen | Large / open-concept | 8–12+ weeks |
What decides the timeline.
These are GCO’s typical ranges for Ottawa kitchens. The biggest swing factors are the ones that add steps rather than days: taking out or moving walls, relocating plumbing, structural work, and waiting on custom cabinetry and countertops.
Kitchens that keep the existing layout move fastest. Opening a kitchen to the living room or moving the sink to an island adds framing, plumbing and usually a building permit; see do you need a building permit in Ottawa?
The steps, in order.
Every GCO kitchen follows the same sequence. Planning happens before anything is torn out, so the weeks of construction are spent building, not deciding.
- Consultation and measurement: goals, layout problems, style, budget and priorities
- Design and planning: layout, materials, fixtures and a working budget
- Permits and City coordination, when walls, plumbing or major electrical change
- Demolition and site preparation, with the rest of the house protected
- Framing, plumbing and electrical rough-in, and any structural work
- Cabinets, countertops, backsplash, flooring and built-ins
- Sinks, faucets, lighting, hardware and appliances, installed and tested
- Paint, trim, touch-ups and a final walkthrough
What slows a kitchen down.
Most delays are predictable, which is why they are worth settling before demolition day.
- Changing the design after work starts. Ontario’s own guidance warns that mid-project changes cost extra, and they cost time too
- Product lead times for custom cabinets, slab countertops and special-order fixtures
- Permit review when the layout, walls or plumbing change
- Inspections that have to happen before walls can be closed
Living with it while it happens.
A kitchen renovation is easier to live through when the mess is contained. GCO works behind dust containment and keeps the site clean throughout, under a during-scope-of-work cleanliness and safety guarantee, and every project finishes with a complimentary high-end clean.
You get the schedule in writing before demolition starts. See our kitchen renovation page for Ottawa price ranges and a sample cost breakdown.
Quick answers.
Short, plain answers. Anything else, call and ask for Aurelio, the owner of GCO Contracting.
About 2 to 4 weeks for a small-kitchen refresh: new counters, backsplash, fixtures and paint on the existing layout.
About 4 to 12 weeks, depending on size, scope, cabinet and countertop lead times, structural work and permits. A standard remodel is typically 4 to 6 weeks; a luxury or open-concept kitchen can take 8 to 12 weeks or more.
Yes. Both usually need a City of Ottawa building permit and add framing, plumbing and inspection steps. Keeping the existing layout is the fastest route.
With GCO, you get the schedule in writing before demolition starts, after design and selections are settled.
Sources.
Rules and timelines change, so check the official pages for your own project.